• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • Facebook
  • Twitter
  • YouTube

Owner Login | Tenant Login | 323-255-9400 ext. 4   GET A QUOTE

Los Angeles Property Management Group offering residential, luxury, and commercial property management in the Los Angeles area

Los Angeles Property Management Group

Property management in Los Angeles & the Valley, done right.

  • Services
    • Residential Property Management
    • Luxury Property Management
    • Commercial Property Management
    • Get A Quote
    • Why Agents Trust Us
  • Why Choose LAPMG
    • Mission Statement
    • Recent Reviews
    • Awards and Recognition
    • Our Team
  • Articles
    • David Crown in Forbes
    • Case Studies
    • Industry Blog
  • Areas Served
  • Careers
  • Contact
    • Contact Us
    • Portal Logins
    • Prospective Tenants
    • Our Team
    • Owner FAQs
    • Resident FAQs
    • Privacy Policy

Case Study: How One Owner Profited by Remodeling During a Major Vacancy

June 19, 2024 LAPMG

The Challenge

Architect and commercial property owner Eric Luk had a decision to make. His five-building commercial complex West Main Place Medical and Professional Plaza was about to lose a major tenant occupying roughly fifteen percent of the complex’s leasable units. In the face of major vacancy, he could either hit the panic button and lower rents to fill the empty units with tenants right away, or he could invest in the long game by renovating and remodeling his property. Luk chose the latter, remodeling to the tune of $1.1 million, and the results prove he chose wisely.

Let’s look at how and why this remodel in the face of vacancy ultimately translated to profits for the property owner.

Doubling Down: How One Owner Profited by Remodeling During a Major Vacancy

The Solution

Luk’s father was the developer and structural engineer who brought West Main Place to life in 1982, and Luk himself—then a young architecture student at USC—designed the complex. But times change, and so do taste and technology, so when a prominent tenant of his complex left to buy their own building and West Main Place hadn’t seen significant updates in thirty-five years, Luk decided it was time for an upgrade.

Doubling Down: How One Owner Profited by Remodeling During a Major Vacancy

“I wanted to make the center more cutting-edge, and provide a better work environment for our tenants, some who have been there since the buildings were first built,” says Luk. “It was also important for the buildings to be more sustainable in a real way​, with drought resistant landscaping, new efficient LED lighting, water saving fixtures​, and recycled building materials.”

West Main Place measures 60,000 square feet in total and consists of two three-story medical/office buildings, two one-story medical/office buildings, and a one-story restaurant. Spread across the entire complex, the renovations began in February and included new common areas, a new building facade, new landscaping, and new paved parking areas. The once-fashionable but since-outdated browns of the early 1980’s were replaced by bright, welcoming yellows and reds in common areas, complete with sleek leather chairs and varnished wooden coffee tables.

“There was new marble flooring that went in, there was marble put up on the walls, there were new paint color schemes, there were creative accents that were built into off-the-wall systems, and there was new furniture put in,” says Greg Camacho of Camacho Commercial Real Estate, the company that oversaw the remodel. “It’s a lot.”

Doubling Down: How One Owner Profited by Remodeling During a Major Vacancy

The renovations to West Main Place spanned eleven months in total, with improvements to the non-vacant units taking place solely at night. After almost a year and $1.1 million invested, the state-of-the-art complex looked brand new and better than ever. “The tenants already in there were thrilled,” says Camacho. “In the medical field, tenants often stay for a really long time. It’s harder for them to move than it is for a general office user, because the patients come visit them. So, ownership felt like the remodel was due for those tenants.”

In order to ensure that all aspects of the transition went off without a hitch, Luk hired a property manager at the outset of the remodel. “Los Angeles Property Management Group came on when the project had initially commenced,” says Luk. “They worked very hard at keeping the tenants notified and satisfied during the construction process. They assisted in the final phases, including refinishing of doors, new signage throughout the center, and work related to completing all fire inspections.”

Doubling Down: How One Owner Profited by Remodeling During a Major Vacancy

Though it’s easy to get swept up in the external appeal of these sprawling improvements, Camacho reminds me: “Let’s not forget that, at the end of the day, making these changes allows us to collect more rent.”

The Results

Simply put, these renovations will pay for themselves and then some. In fact, they’ve already begun to do so: even during the renovations, Luk and Camacho saw the benefits manifest. “People were looking at the materials that were partially done, and saying, ‘Okay, if this is the direction, I want to get in now before rates go up,’” says Camacho. “Not only are we looking at increasing rents by 20%, but we’re also decreasing downtime, because we have a bigger pool of potential tenants looking at the space, because the space looks better. For example, we had a space that had been vacant for over a year, the entire third floor, and since the renovation, we’re 100% leased.”

The upsides of this large-scale modernization speak for themselves: increased profits from rent, vacancies filled (and filled faster than they would’ve been, likely by longer-staying tenants), and more satisfied current tenants. The case of West Main Place Medical and Professional Plaza is a testament to the advantages of “doubling down” in the face of major vacancy—that is, investing capital in a property’s long-term future rather than taking stopgap measures like lowering rents.

Author

  • LAPMG

    View all posts

Filed Under: Case Studies, Commercial Properties, LA Property Management News, Latest News, Projects, Property Management Education, Property Management FAQ, Residential Properties Tagged With: advice for property owners, commercial real estate

Primary Sidebar

    PROPERTY OWNERS: CONTACT US FOR A FAST FREE QUOTE

    (This space is not for tenant contact. Check out our listing page.)







    Loading...

    Footer

    Award-winning management means:

    Best property management in Los Angeles - Our Awards

    • Maximum profits.
    • Responsive service.
    • Vacancies filled quickly.
    • Accurate understandable monthly reports.

    Proud Members of:

    AAGLA AOACA AIR Commercial Real Estate Association Member BOMA 2024 Member of Forbes Real Estate Council Great place to work

    Contact Information

    
    

    YouTube LAPMG   Facebook LAPMG   Twitter LAPMG   Los Angeles Property Management Group on Google Maps

    Los Angeles Property Management Group
    10960 Ventura Boulevard Second Floor
    Studio City, CA, 91604
    Phone: 323-255-9400
    Contact Us

    Los Angeles Property Management Group is a licensed real estate broker, State of California, DRE License Number 01931033.

    Los Angeles Property Construction Inc. is a licensed contractor, State of California, Contractor State License Board Lic. # 1050649.

    Kyle Crown DRE License #0193638
    David Crown DRE License #01157354

    © 2025 Los Angeles Property Management Group · Privacy Policy
    10960 Ventura Boulevard Second Floor, Studio City, CA 91604 · Phone: (323) 255-9400
    LAPMG is committed to ensuring digital accessibility for people with disabilities. We are continually improving the user experience for everyone and applying the relevant accessibility standards. If you have any issues, please contact dcrown@lapmg.com.